Located in northeast Saskatchewan, the Hidden Bay property hosts the sixth largest undeveloped uranium resource in the Athabasca Basin. The recent National Instrument 43-101 ("N.I. 43-101") Preliminary Assessment Technical Report ("PA"), prepared by SRK Consulting (Canada) Inc. ("SRK"), found the economics of mining the Horseshoe and Raven deposits to be "very robust." A base case scenario of $60 (US) per pound of U3O8 would yield an estimated C$246 million in earnings before interest and taxes.
The proximity of Horseshoe and Raven to milling facilities operated by Cameco Corporation ("Cameco") and AREVA Resources Canada Inc. may significantly reduce the capital requirements of the project through potential toll milling agreements. The principal hydroelectric transmission lines that service both of these facilities also pass 3 kilometres to the north of the deposits. The Raven pit may have further cost-savings potential as a regional tailings facility. The PA addresses these potential benefits in addition to numerous other opportunities for the improvement of economics at Hidden Bay.
Resources at Horseshoe and Raven have been estimated following N.I. 43-101 standards. The deposits contain in excess of 35 million pounds U3O8 Indicated Mineral Resources and 2.7 million pounds U3O8 Inferred Mineral Resources at a cut-off of 0.05% U3O8.
The following table shows the breakdown of the contribution of the Horseshoe and Raven deposits to the total Indicated Mineral Resources at a 0.05% U3O8 cut-off.
| Deposit | Tonnes | Grade U3O8 (%) | Total U3O8 (lbs) |
|---|---|---|---|
| Horseshoe | 5,119,700 | 0.203 | 22,895,000 |
| Raven | 5,173,900 | 0.107 | 12,149,000 |
| TOTAL | 10,293,600 | 0.155 | 35,044,000 |
The following table shows the breakdown of the contribution of the Horseshoe and Raven deposits to the total Inferred Mineral Resources at a 0.05% U3O8 cut-off.
| Deposit | Tonnes | Grade U3O8 (%) | Total U3O8 (lbs) |
|---|---|---|---|
| Horseshoe | 287,000 | 0.166 | 1,049,000 |
| Raven | 822,200 | 0.092 | 1,666,000 |
| TOTAL | 1,109,200 | 0.111 | 2,715,000 |
Resources at West Bear have been estimated following N.I. 43-101 standards. The following table shows the contribution of the West Bear Deposit to UEX's Indicated Mineral Resources at a 0.05% U3O8 cut-off.
| Deposit | Tonnes | Grade U3O8 (%) | Total U3O8 (lbs) |
|---|---|---|---|
| West Bear | 78,900 | 0.908 | 1,579,000 |
The recent N.I. 43-101 Preliminary Assessment Technical Report ("PA") prepared by SRK found the economics of mining the Horseshoe and Raven deposits to be "very robust."
(These results are included in a technical report on the Hidden Bay property with an effective date of February 15, 2011 available online under UEX's profile at www.sedar.com.)
The PA recommends that the project be advanced to a preliminary feasibility level, and that this next phase of study also include UEX's West Bear Deposit.
The PA was conducted utilizing cut-off grades calculated on the basis of $60 (US) per pound of U3O8 in the mine optimization plan under which 16.6 million pounds of U3O8 would be extracted over a seven-year mine life. This Base Case scenario at $60 (US) per lb of U3O8 is shown below.
| Price U3O8 (per lb) |
EBIT (C$ millions) |
NPV5% (C$ millions) |
IRR (%) |
|---|---|---|---|
| $60 (US) | 246 | 163 | 42 |
UEX is focused on advancing the deposits at Horseshoe and Raven through pre-feasibility and ultimately to feasibility level to assess the potential economics and viability of mining the deposits. The Hidden Bay Project has numerous opportunities for the improvement of economics, including:
The Hidden Bay property has a long history dating back to the early days of exploration in the eastern Athabasca Basin in the 1960s.
Ownership: 100% UEX Corporation (with the exception of Mineral Lease 5424 which is held 76.73% by UEX and 23.27% by three minority partners)
Project operator: UEX Corporation
Property size: 57,321 hectares, 42 claims
Uranium deposits: Horseshoe, Raven, West Bear
Cumulative expenditures
(as at December 31, 2012)
| Exploration | C$60.5 million |
| Development | C$ 6.6 million |
2013 Budget
| Exploration (est.) | C$ 0.5 million |
| Development (est.) | C$ 1.0 million |
Uranium Quick Fact:
Since 1996, Saskatchewan has been the only Canadian province producing uranium.
(Source: World Nuclear Association)
GlossaryUEX Management Tour
Cameco's Rabbit Lake Mill
September 22, 2011
TLD Badge System
Employees and contractors working in the Athabasca Basin are equipped with a thermo-luminescent dosimeter (TLD) badge, a small package containing a radiation-sensitive material which is worn on a person's clothing. TLD badges are used to accurately measure each person's accumulated level of radiation exposure while on-site for uranium exploration. UEX is committed to the health and safety of all personnel and has individual TLD badges measured on a quarterly basis to ensure that radiation levels are within regulations established by the Canadian Nuclear Safety Commission.