|
 |  | News Releases are added to our web site immediately upon release to the general public. If you would like to receive news releases via e-mail or fax, please fill out our Request More Information form.
 |
Wed Jun 18, 2008 UEX/AREVA Drilling Outlines New Zone of High-grade Mineralization South of Kianna Deposit: SHE-123-8 Intersects 8.9% eU3O8 over 6.1 metres Including 27.4% eU3O8 over 1.7 metres at the Unconformity Significant Basement Mineralization Outlined South of the Colette Deposit over a Strike Length of 200 metres: SHE-126 Intersects 0.68% eU3O8 over 11.4 metres Including 3.45% eU3O8 over 0.50 metres.
UEX Corporation ("UEX") announced today that AREVA group subsidiary AREVA Resources Canada Inc. ("AREVA") has reported to UEX all results from ... (140 KB) |
 |
Tue May 27, 2008 UEX expands Horseshoe Deposit intersecting 0.87% U(3)O(8) over 10.3 metres and reports further continuity of mineralization at the Raven Deposit intersecting 0.38% U(3)O(8) over 37.3 metres
UEX Corporation ("UEX") is pleased to announce the results from the first 93 diamond drill holes which were completed during the winter 2008 program on UEX's 100% owned Hidden Bay property in northern Saskatchewan. The program comprised mainly definition and stepout drilling at the Horseshoe and Raven Deposits ("Horseshoe" and "Raven"). In total, 20,371 metres of drilling wer... (97 KB) |
 |
Wed Apr 9, 2008 UEX reports final results of 2007 Horseshoe and Raven drilling, including 0.47% U3O8 over 37.4 metres at Horseshoe, and 2.98% U3O8 over 5.2 metres at Raven
UEX Corporation ("UEX") is pleased to announce the results from the final 43 diamond drill holes which were completed during the summer/fall 2007 program at the Horseshoe Deposit ("Horseshoe"), and 33 diamond drill holes at the adjacent Raven deposit ("Raven"). Both deposits are located within UEX's 100% owned Hidden Bay Project in the eastern Athabasca Basin area of northern... (94 KB) |
 |
Wed Mar 26, 2008 Eaton Joins UEX Board VANCOUVER, March 26, 2008 - UEX Corporation ("UEX") is pleased to announce the appointment of Mark P. Eaton to the Board of Directors of UEX. Mr. Eaton is an experienced investment professional with over 20 years of experience in equity capital markets specializing in the resource sector.
After graduating from Hull University, England in 1984, Mr. Eaton began his career in institutional equity sales. From 1985 to 1995, Mr. Eaton worked in London, U.K. for several leading Canadian investment d... (3 KB) |
 |
Tue Jan 22, 2008 UEX Commences 2008 Winter Exploration Program at Black Lake and Riou Lake Uranium Projects UEX Corporation ("UEX") is pleased to announce that a winter 2008 exploration program, budgeted at $1.2 million, is under way at the Black Lake Uranium Project ("Black Lake"), and the Riou Lake Uranium Project ("Riou Lake") both located in the northeastern part of the Athabasca Basin near Stony Rapids, Saskatchewan, Canada. The program will utilize one diamond drill rig with all drilling to be performed by Britton Bros. Diamond Drilling Ltd. of Smithers, B.C.
Black Lake, comprising 30,381 he... (11 KB) |
 |
Thu Jan 17, 2008 UEX Launches Largest Winter Drilling Program at Hidden Bay with Six Drills UEX Corporation ("UEX") is pleased to announce that a 40,000 metre winter exploration and infill drilling program, budgeted at $8.0 million, is under way on its 100% owned Hidden Bay Uranium Project ("Hidden Bay") in the eastern Athabasca Basin area of northern Saskatchewan. Hidden Bay includes the Raven Deposit ("Raven"), the Horseshoe Deposit ("Horseshoe"), and the West Bear Deposit. Six diamond drill rigs are on site with three operating at Horseshoe, two at Raven, and one to begin shortly at... (10 KB) |
 |
Tue Jan 15, 2008 UEX/AREVA Launch Largest Drill Program to Date at Shea Creek with Four Drills UEX Corporation ("UEX") is pleased to announce that AREVA Group subsidiary AREVA Resources Canada Inc. ("AREVA") has commenced the 2008 drilling program at the Shea Creek Uranium Project ("Shea Creek"), which is located in the western Athabasca Basin of northern Saskatchewan, Canada.
Shea Creek hosts the Kianna, Anne, and Colette Deposits and is one of the ten 49%-owned Western Athabasca Uranium Projects joint-ventured with AREVA, the operator.
The planned minimum budget of $20.3 million f... (13 KB) |
 |
Fri Jan 11, 2008 UEX Earns Full 49% Interest in AREVA's Western Athabasca Uranium Projects UEX Corporation ("UEX") has received confirmation from AREVA Group subsidiary AREVA Resources Canada Inc. ("AREVA") that total expenditures incurred by UEX as of December 31, 2007 on AREVA's ten Western Athabasca Uranium Projects (the "Projects") exceeds $30.0 million.
UEX now fully-vested holds a 49% interest in the Projects as defined in the Western Athabasca Option Agreement ("the Agreement") between UEX and AREVA. The Projects include the Shea Creek Uranium Project ("Shea Creek"), which h... (5 KB) |
 |
Wed Jan 2, 2008 UEX reports the second best hole from the Horseshoe Deposit to date: HU-134 intersects 0.75% U3O8 over 31.7 metres including 3.00% U3O8 over 6.1 metres. UEX Corporation ("UEX") is pleased to announce the results from an additional 23 diamond drill holes which were recently completed during the summer/fall 2007 program at the Horseshoe Deposit ("Horseshoe") adjacent to the Raven Deposit ("Raven") located within UEX's 100% owned Hidden Bay Project in the eastern Athabasca Basin area of northern Saskatchewan.
The drill results represent a continuing combination of infill and stepout drill holes, the latter which have extended mineralization furt... (53 KB) |
 |
Thu Dec 13, 2007 UEX Interim Resource Estimate for the West Bear Deposit Adds 223,000 Pounds of U3O8 Outlining an Indicated Resource of 73,800 Tonnes, Grading 1.004% U3O8 and Totaling 1.614 Million Pounds of U3O8 Final Resource Estimate to be Completed in 2008 UEX Corporation ("UEX") is pleased to announce that it has received an interim resource estimate report from Golder Associates Ltd. ("Golder") of Saskatoon, SK, for UEX's West Bear Uranium Deposit ("West Bear"). West Bear is located within the southern block of UEX's 100%-owned Hidden Bay Project in the eastern Athabasca Basin area of northern Saskatchewan, Canada. The new resource estimate is 73,800 tonnes grading 1.004% U3O8 containing 1.614 million pounds of U3O8 using a cut-off grade of 0.15... (13 KB) |
| |
|